Senior Construction Scheduling Specialist Job at Kelly Science, Engineering, Technology & Telecom, Seadrift, TX

M3pZNlRJZGp0cVErUkJWb3FFQk45R3YrVXc9PQ==
  • Kelly Science, Engineering, Technology & Telecom
  • Seadrift, TX

Job Description

Kelly is currently seeking an experienced Senior Construction Scheduling Specialist in the Seadrift, Texas area! The Senior Construction Scheduling Specialist acts as a technical resource for Scheduling within the Global Project Methodology (GPM) work process and supports establishment of the overall construction schedule baseline and reporting to monitor and control the construction activities within established tolerances of the baseline supporting efficient project execution. In this role you coordinate data inputs from the various construction contractors and internal disciplines to ensure accurate forecasts and reporting of schedule and engage the project steering team to understand causes of the deviation and the need to establish actions to mitigate, where deviations from established tolerances occur. Requires expanded conceptual and practical knowledge in own job discipline and broadens capabilities.

Responsibilities / Duties

  • Recommendations on cycle time reduction opportunities and techniques
  • Develops and maintains comprehensive integrated master project schedules including Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages.
  • Utilizes project cost estimates to resource load project schedules and gain alignment with estimated scope of work and the project schedule.
  • Recommendations on cycle time reduction opportunities and techniques
  • Performs staffing density checks or staffing limitation checks to validate schedule durations and ensures resource-level supports the project strategy.
  • Leads project teams in forecasting schedule challenges and offers analyses and solutions to complete the project on schedule.
  • Performs critical path analysis to determine problem areas in regard to project schedule and resource overloads and offers alternative courses of action to the project team.
  • Evaluates project deviations to assess schedule impact for proper decision making and recovery plans.
  • Applies established schedule management practices to ascertain critical schedule issues and recommend corrective actions. Experience
  • Practical experience as a scheduler working for a large main construction contractor in coordinating multiple subcontractors (e.g. in coordination of civil, structural steel, piping, insulation and scaffolding etc
  • Assist in developing and maintaining comprehensive integrated master project schedules including Front-end Loading, Detail Design, Procurement, Construction and Start-up/Commissioning Project Stages.
  • Maintains construction schedule during the project life cycle monitoring progress and incorporating modifications where changes in the original scope occur or delays are encountered.
  • Leads project teams in forecasting schedule challenges and offers analyses and solutions to complete the project on schedule.
  • Evaluates project deviations to assess schedule impact for proper decision making and recovery plans.
  • Applies established schedule management practices to ascertain critical schedule issues and recommend corrective actions.
  • Assist in quantity tracking and installation rates
  • Performs quantity surveys to validate construction progress

Required qualifications

  • A minimum of a bachelor's degree in any discipline or 10 years of experience in project controls, engineering, manufacturing, or related experience.
  • Prior construction related experience.
  • Proficiency within P6.

Job Tags

For subcontractor,

Similar Jobs

TAD PGS, Inc.

FAA Material Handler Job at TAD PGS, Inc.

 ...We have an outstanding Contract position for an FAA Material Handler to join a leading Company located in the Phoenix, AZ surrounding area.**US Citizenship is required.**Responsibilities:~Responsible for loading and unloading materials within a warehouse or storage... 

United Services Northwest

Roofer Job at United Services Northwest

 ...Roofer Parent Company: United Services Northwest Hiring For: Washington Roofing Location: Serving King, Snohomish, Pierce, and Island Counties Employment: Full-time About Us United Services Northwest is a family of locally owned service companies providing... 

Valor Hospitality Partners

Corporate Executive Chef Job at Valor Hospitality Partners

 ...unique opening for a Corporate Executive Chef to join our team and help us to develop exceptional chefs and menus for our full-service hotels. You are an experienced corporate chef with a full-service, elevated cuisine background, who is passionate about our industry and... 

CRSI

Direct Support Professional/Caregiver - Allen County (Lima, OH) - 2nd and 3rd Shift Only Job at CRSI

Direct Support Professional/Caregiver - Allen County (Lima, OH) - 2nd and 3rd Shift Only Champaign Residential Services Being a DSP isn't just a job, it's a career, in a high demand Healthcare field"~$1000 Sign-on Bonus/Up to $1500 Referral Bonus ~ Paid Training...

Avamere

Full Time Interim/Float Director of Nursing/Registered Nurse Job at Avamere

 ...Full-Time Float/Interim Directorof Nursing Services / DNS (RN) Avamere Washington State Region Status: Full-Time Setting:Skilled Nursing (SNF) Schedule: Monday-Friday Apply at Teamavamere.com Join our team as the Director of Nursing (DNS...